Skip to content

Philippines Today

home of the Global Filipino

Menu
  • News Stories
  • Regional News
  • Business & Economy
  • Science & Technology
  • International
Menu

President Aquino inspects USD82.9-M world-class international airport development in Puerto Princesa

Posted on June 29, 2015

By Celeste Anna R. Formoso

PUERTO PRINCESA CITY, June 29 (PNA) –- The upgrading of the Puerto Princesa City Airport (PPCA) into a world-class international gateway in this city has reached 30-percent completion, Department of Transportation and Communications (DOTC) Undersecretary Julianito Bucayan Jr. informed President Benigno Aquino III during the latter’s brief visit Monday morning.

The Puerto Princesa Airport Development Project (PPADP), which was part of President Aquino’s third state of the nation address (SONA) in 2012, is under the USD82.9-million design-and-build contract awarded to Korea’s Kumho Industrial Co. Ltd.-GS Engineering & ConstructionJoint Venture financed by the Economic Development Cooperation Fund (EDCF).

In briefing President Aquino, the DOTC undersecretary said that the Puerto Princesa Airport Development Project (PPDAP) is intended “to enhance the quality of airport services in Palawan, comply with the International Civil Aviation Organization (ICAO) safety standards, expand the Puerto Princesa international airport capacity to addressthe growing air traffic” in the province.

It is designed to accommodate two million passengers per annum with a peak flow of 690 travelers per hour.

Showing President Aquino a slide of the passenger terminal, the DOTC undersecretary informed that of the total project cost of USD102.561-million, the construction is USD82.9-million or PHP3.755-billion.

“The passenger traffic in Palawan at its peak is 690 at the most comfortable level, Mr. President, or roughly 15 square meters per person so, if we’re going to compress, it can go much higher,” he said, adding that the capacity of the existing airport is only 200 per 15 square meters.

The main scope of work at the PPDAP involves civil, building, and navigational aid and airfield ground lighting works.

Civil works include the development of new pavement of apron, taxiway, airside roads, access road and car parking lot, and rehabilitation of the existing runway.

Building works, meantime, involve the upgrading of the passenger terminal, cargo terminal, airport tower control (ATC), rescue and fire fighting facility (RFFF) building, administration, maintenance, powerhouse, and temporary facility buildings.

Bucayan said the passenger terminal is 12,999.84 square meters; cargo is 1,213.23 square meters, and administration and operation building has an area of 749.43 square meters.

“The passenger terminal has an almost total area of 13,000 square meters compared to the current existing that only has a 3,000-square meter floor area. This is bigger in terms of floor area by one hectare,” he informed President Aquino.

The ATC, he said, is going to be ICAO compliant since it will have state-of-the-art equipment facilities for air traffic control.

Of the total USD102.561-million total project cost, Bucayan updated President Aquino that the Korean government through the EDCF provided USD71.6-million that has an interest rate of .1% and payable in 40 years.

The runway of the world-class international airport in the city is 2,600 meters long to comply with the ICAO safety standard of at least minimum 150 meters from the centerline.

Started in August 1, 2014, Bucayan said the PPADP is expected to be completed by January 2017.

“Frankly, Mr. President, we’re ahead by 1 percent; the actual target completion is only 29.12 percent, but we have already achieved 30 percent, or board efficient by 103 percent,” said Bucayan.

Upon hearing this, President Aquino retorted in jest, “Isn’t it supposed to be completed in 2016?”

The DOTC undersecretary said they are pushing for the airport project to be finished in less than 900 days. “We’re pushing for that, Mr. President, yes. We’re doing everything a lot earlier. The air navigation is expected to be finished much, much earlier,” he said.

In his 2012 SONA, President Aquino announced the airport upgrading of Puerto Princesa along with others in the country to improve existing facilities by expanding their capacities to meet projected passenger and cargo demands, as well as to enhance their aviation operations, services, security and safety standards in compliance withinternational standards. (PNA)

Share this:

  • Facebook
  • Twitter
  • LinkedIn
  • Pinterest
  • More
  • Tumblr
  • Reddit

Related

News Categories

  • Announcement (34)
  • Business & Economy (1,567)
  • Comment and Opinion (74)
    • Random Thoughts (18)
  • Current Issues (425)
    • Charter Change (1)
    • Election (228)
    • Population (6)
  • International (389)
  • Life In Japan (66)
    • Everything Japan (41)
  • Literary (34)
  • Miscellaneous (610)
  • News Stories (5,312)
  • OFW Corner (297)
  • Others (75)
  • People (408)
  • Press Releases (163)
  • Regional News (3,362)
  • Science and Technology (502)
  • Sports & Entertainment (287)

Latest News

  • BSP keeps policy rates anew December 17, 2015
  • NEDA cuts PHL additional rice import for 2016 by 25% December 17, 2015
  • DA cites serious implications of banning genetically modified products December 17, 2015
  • BBL is not yet dead – Drilon December 17, 2015
  • Comelec recognizes Duterte’s CoC for president December 17, 2015
  • NEDA chief sees 2015 growth at 6% despite typhoons December 17, 2015
  • House of Representatives ratifies bicam report on P3.002-T national budget for 2016 December 17, 2015
  • Cebu-based developer invests PHP430M to build 709 townhouse units in north Cebu town December 17, 2015
  • City gov’t eyes P75-M income from economic enterprise December 17, 2015
  • Baguio City LGU presents traffic plan for holiday season December 17, 2015

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Science and Technology

  • DOST-ICTO targets 500,000 web-based workers from countryside by 2016
  • (Feature) STARBOOKS: A ‘makeover’ for librarians
  • Science, research reduce ‘cocolisap’ hotspot areas in PHL
  • Montejo to further improve PAGASA and empower scientists
  • 1st PPP in biomedical research produces knee replacement system fit for Asians

Press Releases

  • Microsoft to buy Nokia’s mobile devices business for 5.44-B euros
  • New World Bank climate change report should spur SEA and world leaders into action: Greenpeace
  • Save the Philippine Seas before it’s too late — Greenpeace
  • Palanca Awards’ last call for entries
  • Philippines joins the global call for Arctic protection

Comment and Opinion

  • Remembering the dead is a celebration of life
  • Killer earthquake unlikely to hit Panay Island in near future – analyst
  • It’s not just more fun to invest in the Philippines, it is also profitable, says President Aquino
  • How does one differentiate a tamaraw from a carabao?
  • Fun is not just about the place, it is also about the people, says DOT chief

OFW Corner

  • Ebola infection risk low in Croatia
  • Death toll rises to 41, over 100 still missing in landslide in India
  • Asbestos use in construction a labor hazard
  • 500,000 OFWs to benefit POEA on-line transactions — Baldoz
  • 25 distressed OFWs return home from Riyadh
©2025 Philippines Today | Design: Newspaperly WordPress Theme